杭州26℃-18℃ 下载APP 我要投稿

Watch out: elevated road partly closed 18 months丨注意!这段高架封道施工一年半 

2021-04-13 10:23 |柯桥发布

  Elevated China Textile City Ave. of State Highway G104 to be partly closed 18 months

  The access to the east and west ends of the Elevated China Textile City Ave. of State Highway G104 will be fully closed from Apr. 12, 2021 to Aug. 31, 2022, due to the construction of smart expressway of 2nd Ring Road(North)in Shaoxing and construction of elevated Keqiao section of State Highway G104 connecting Hangzhou Central Ring Road. Vehicles may get onto and leave the elevated road via Jingshui Road Flyover or the ramps at Yuezhou Ave. and Hubin Road. The ground road of State Highway G104 will remain open to traffic, on some sections of which, however, lanes will be reduced. So please make a detour when driving through the above zone, watch out for traffic signs at construction sites and follow the guidance by traffic personnel. We apologize for inconveniences to be incurred therefrom.

  Shaoxing Infrastructure Construction & Investment Ltd

  Shaoxing Keqiao District Transportation Investment & Construction Group Ltd

  Apr. 7th, 2021

  104国道轻纺城大道高架封闭施工1年半

  因绍兴二环北路智慧快速路和杭州中环104国道柯桥段高架工程建设,104国道柯桥轻纺城大道高架桥主线东、西两端上下接坡处,将于2021年4月12至2022年8月31日全封闭施工,过往车辆可通过镜水路立交和湖滨路、越州大道的匝道上下,104国道地面道路车辆仍可通行,但局部路段车道减少。请途经车辆提前绕行,注意施工路段道路交通标志,服从现场交通管理人员指挥。由此带来的不便,敬请谅解。

  特此通告。

  绍兴市基础设施建设投资有限公司

  绍兴市柯桥区交通投资建设集团有限公司

  2021年4月7日

  ▼

  翻译:赵泉元

  责任编辑:陈曦

  统筹:叶红 徐鸿

  Please follow us

  Scan the QR code “IN KEQIAO”

最新评论(8)

暂无内容!

点击加载更多…

0/0